Global Response Systems
Global Response Systems
WellCONTAINED delivers an adaptable-response equipment package built for a variety of subsea scenarios. Based on extensive experience in subsea well control, the Tier I kit’s design criteria provide for a depth rating of 12,500 fsw, 15,000 psi shut-in pressure, and dual mechanical barriers, complete with ROV-controlled functionality. The capping stack’s modular design facilitates rapid global deployment on readily available Boeing 747 or Antonov AN124 cargo aircraft. The systems are verified by third parties and staged for deployment at our Aberdeen and Singapore locations.
Global Response Systems
The debris removal package contains two sizes of subsea shears that provide the cutting capability of tubular and structural members up to 46 inches in size. The shears can be used for activities like cutting bent or broken riser, shearing pipe or clearing an area to prepare for capping stack activities.
Global Response Systems
The subsea dispersant application package includes all required hardware to facilitate the application of dispersants subsea from the client-provided down line (coiled tubing or hose) through application wands or ROV hot stabs. Key components include the subsea routing manifold, and subsea distribution manifold/hose deployment reel with 1,000 ft of 1-in. ID subsea hose. The system is rated to 10,000 psi for the Global Package and 5,000psi for the Regional Package and may also be used to convey hydrate inhibition and remediation chemicals as well as control line fluids.
The capping stacks comprise 18 3/4-in. 15K Cameron Type TL ram assemblies and drilling spools with four outlets, which are outfitted with chokes for soft shut‐in operations or gooseneck assemblies for extended flow back/well kill operations. The capping stacks also feature chemical injection (dispersant or hydrate mitigation/remediation) as well as internal pressure and temperature monitoring capability with acoustic transmission of readings to the surface. The stacks can be connected to a BOP or on top of a wellhead utilizing HC and H4 connectors that are included in the package. The capping stacks are deployable on either drillpipe or wire.
Global Response Systems
Status | Ready | Ready |
Manufacturer | Wild Well / Cameron | Trendsetter |
Pressure Rating | 15,000 psi | 15,000 psi |
Water Depth Rating | 12,500 ft | 12,500 ft |
Bore Restriction | No - 18 3/4-in. unobstructed bore | No - 18 3/4-in. unobstructed bore |
Main Bore | 3ea, 18 3/4-in. Cameron type TL BOPs with Blind Shear Rams | 2ea, 18 3/4-in. Cameron type TL BOPs with Blind Shear Rams |
Diverter Below | Yes | Yes |
Outlets | 4ea, 3 1/16-in. Outlets | 4ea, 5 1/8-in. Outlets |
Chokes | 2ea, 3 1/16 in. | 4ea, 5 1/8 in. |
Connectors | Cameron HC and Cameron H4 | Cameron HC, Cameron H4, DrilQuip DX-15 H4 |
Weight | 105 MT | 110 MT |
Airfreight / # of planes | Yes / 3ea 747 or 2ea AN124 | Yes / 3ea 747 or 2ea AN124 |
Chemical Injection Capability | Yes | Yes |
Controls | ROV Hydraulic and Torque Tool | ROV Hydraulic and Torque Tool |
Running Methods | Work Wire and Drillpipe | Work Wire and Drillpipe |
In-house Planning, Engineering, and Deployment Services | Yes | Yes |
Global Response Systems
To provide hydraulic power to function the equipment that may be employed during the response operations, ROV-deployable hydraulic skids are included. Two complete ROV skids are included in the Global package along with complete spares of the pump trays on each skid. All of the equipment is stored/shipped in a single 20ft container that also contains an HPU for maintenance and deck testing. This tooling may also be used to conduct secondary operation of the primary BOP.